Time / Date: 11/28/2022 8:19:22
|
JSP ID: 266
|
Scope of Work: PM VFD
|
|
Work Order: W0296936
|
Building:
|
Person in Charge: J Pica
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: josephpica@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: B. Cameron
|
|
List Other Participants: None
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 59VFD001
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Request Permission through Control Room Confirm Associated Blower Stopped Switch 596A1A9A cb3 - Open/Off Verity Zero Voltage at VFD Replace VFD Fan Lift Motor Leads as Necessary to Perform and Record MegOhm Readings Return Configuration to Normal Verify Blower Rotation Report to Control Room Return to Service |
Control of Work Area
Minimum Approach Boundary: 43” during ZVV
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 4.92cal cal/cm2
|
Arc Flash Boundary: 43”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: None
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Bldg 59 Lobby / Bldg 59 Basement
|
Emergency Number to Call: 7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Bldg 59 Lobby
|
Fire Extinguisher Location: Bldg 59 Lobby / Bldg 59 Basement
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: