Time / Date: 6/26/2024 7:33:03
|
JSP ID: 2701
|
|
Scope of Work: Cable Locating
|
|
|
Work Order: W0386885
|
Building: EMH 195
|
|
Person in Charge: Pica
|
Lead / Supervisor: Cameron, Benjamin
|
|
Logged Email: josephpica@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
|
Second Person Requirement: Safety Watch
|
|
|
Second Person Identified: Pica
|
|
|
List Other Participants: Locator Kevin Dobbs
|
|
|
Affected Persons Notified: N/A
|
|
|
Switching: No Switching Required
|
Panel / Equipment ID: EMH195 SWA6-circuits
|
|
System Information Review: Single Line Drawing, Butterflies
|
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
|
Equipment Condition: No signs of impending failure
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
Clamp On Locate |
Control of Work Area
|
Minimum Approach Boundary: Breach
|
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
|
System Voltage: Static
|
|
Limited Approach Boundary: Clamp On Hot Stick
|
|
Restricted Approach Boundary: Locating
|
|
Will the hands enter the RAB: No
|
|
Voltage Glove Class: Not Required
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: N/A cal/cm2
|
|
Arc Flash Boundary: Manhole Breach
|
|
Working Distance: Discharge
|
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
|
Capacitor Bus Voltage: None n/a
|
|
Capacitor total stored energy (joules): None n/a
|
|
Discharge wait time (minutes): None n/a
|
Emergency Response Plan
|
Nearest Landline Location: Cell Service
|
|
Emergency Number to Call: 911
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: Truck Carry
|
|
Fire Extinguisher Location: Rig Mount
|
|
Contact release method available and tested: Hot Stick
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
Confined space, Potential |
Error Precursors
|
Task Demands:
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature:
|
|
Error Precursor Mitigations:
ReBrief as Job Scope Changes |
PPE Inspections
|
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Non-melting footwear that fully covers the feet, Insulated tools, As Required |
Notes / Other
|
No LOTO req’d
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |