Time / Date: 6/26/2024 10:12:24
JSP ID: 2702
Scope of Work: Investigation on cables sparking possible static charge
Work Order: 381885
Building: EMH 195
Person in Charge: Ben cameron
Lead / Supervisor: Hendrick, Jeffery
Logged Email: AJTurner2@lbl.gov
Division: Facilities
QEW Level: QEW 3
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Safety Watch
Second Person Identified: AveryTurner
List Other Participants: Cable locator
Affected Persons Notified: Yes
Switching: No Switching Required
Panel / Equipment ID:
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
Equipment Condition: Properly installed

Sequence of Job Steps

List basic sequence of steps from start to finish.

Verify approval done proper PPE Make sure everybody is clear before switching the energize circuit lock it out and tag it out

Control of Work Area

Minimum Approach Boundary:
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 12,470 V ac
Limited Approach Boundary: 10 feet
Restricted Approach Boundary: 3 feet, 6 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 2
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: N/A cal/cm2
Arc Flash Boundary: N/A
Working Distance: 36 inches
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 2

Capacitor Hazards

Capacitor Bus Voltage: None
Capacitor total stored energy (joules): None
Discharge wait time (minutes): None

Emergency Response Plan

Nearest Landline Location: Cell ohines
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: On site
Fire Extinguisher Location: Truck
Contact release method available and tested: Rescue hook

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Insufficient lighting, Confined space, Fall hazard

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov