Time / Date: 8/19/2024 12:57:26
|
JSP ID: 2856
|
Scope of Work: Enter Multistack HP-101 and HP-103 and make observations
|
|
Work Order: N/A
|
Building: B92
|
Person in Charge: Williams
|
Lead / Supervisor: Other
|
Logged Email: danwilliams@lbl.gov
|
Division: Other
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Espino
|
|
List Other Participants: Perez
|
|
Affected Persons Notified:
|
Switching: No Switching Required
|
Panel / Equipment ID: HP-101, HP-102
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: All doors and covers closed and fully latched, No signs of impending failure
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
LOTO E700A1A4A ckt HP-101 and HP-102, ZVV at Disc HP-101 and Disc HP-102, enter HP-101 and HP-102 with First Exposure ZVV make observations. Close equipment when complete and remove locks. |
Control of Work Area
Minimum Approach Boundary: 42 in
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: .5 cal /cm2 cal/cm2
|
Arc Flash Boundary: 11 in.
|
Working Distance: 18 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: B92 First Floor
|
Emergency Number to Call: 510-6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Trailer Clark
|
Fire Extinguisher Location: 5th Floor Mech Room
|
Contact release method available and tested: Rescue hook
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands: High workload (memory requirements)
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
STAR |
PPE Inspections
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.