Time / Date: 8/21/2024 7:38:52
|
JSP ID: 2861
|
Scope of Work: Switch panel 302A3A circuit 3 Bank 317. ZVV Panel 317A for Demo re configuration of BA racks S504-S508
|
|
Work Order: WO 393757
|
Building: ALS 6
|
Person in Charge: Chris Nelson
|
Lead / Supervisor: Combs, Everett
|
Logged Email: cnelson@lbl.gov
|
Division: ALS
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Shane Miller
|
|
List Other Participants: Carol with als
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 302A3A/317A
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Briefing with Lead fill out JSP Briefing with RI Carol. Select PPE Switch and LOTO 302A3A circuit 3. Hang LOTO locks establish LOTO with RI, and open panel 317A and ZVV with RI present to witness. Once zero voltage is verified close panel up. |
Control of Work Area
Minimum Approach Boundary: 60 inches
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 60 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 8.14 cal/cm2 cal/cm2
|
Arc Flash Boundary: 60 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: In the gated area near panel 302A3A
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Building 80 or 15 lobby 6 lobby
|
Fire Extinguisher Location: Within 25 feet of switching
|
Contact release method available and tested: Upstream breaker or switch, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Noisy environment |
Error Precursors
Task Demands: Repetitive actions or monotony, Critical steps or irreversible acts
|
Work Environment: Distractions/interruptions, Changes/departures from routine
|
Individual Capabilities: Inappropriate values
|
Human Nature: Stress (limits attention), Habit patterns
|
Error Precursor Mitigations:
BE aware and use safe practices |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |