Time / Date: 8/28/2024 9:08:00
|
JSP ID: 2884
|
Scope of Work: Open Gyrotron cabinet and remove Magnet power Supply for inspection and repair.
|
|
Work Order: N\A
|
Building: 88
|
Person in Charge: Brendan Ford
|
Lead / Supervisor: Other
|
Logged Email: bpford@lbl.gov
|
Division: Other
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Nathaniel Bohm
|
|
List Other Participants: Scott Small, John Garcia, Sean Zhong, Nathaniel Bohm
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: CB 15 in panel 80A4A6A
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1:Make sure Gyrotron owner/users is notified and shutdown Gyrotron. 2:Switch CB 15 in panel 80A4A6A, 480 VAC with Arc Flash Hazard of 5.30 cal. 3:Apply Loto lock and tag on CB 15 and verify absence of voltage on TB 2 inside rear north side of Gyrotron enclosure. 4:Cover High Voltage Power Supply output leads just below Magnet power Supply and small access hole just to the right with rubber insulating blankets for the duration of the work. 5:Remove all connections to the Magnet power Supply and remove from enclosure. 6:Repair/replace Magnet power Supply. Remove rubber insulating blankets and close enclosure. 7:Remove Loto locks and switch CB 15 on and return control to Gyrotron owner/users after functional tests are complete. |
Control of Work Area
Minimum Approach Boundary: 42"
|
Barricade Tape / Attendant: Caution - Yellow
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 5.3 cal/cm2
|
Arc Flash Boundary: 41"
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Less then 15' away just east of panel.
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? No
|
AED Location: E.M. shop and also inside front main entrance of the building.
|
Fire Extinguisher Location: 45' to the South East, on walkway above stairs.
|
Contact release method available and tested: Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Slow down and perform the work in a thoughtful manner. |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |