Logo

QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 9/11/2024 8:00:49
JSP ID: 2926
Scope of Work: Enter manhole and pull DC Cable through

General Information

Work Order
None
Building
6 Manhole 159
Person in Charge
Cameron
Lead / Supervisor
Cameron, Benjamin
Logged Email
jcolmenares@lbl.gov
Division
ALS

Work Planning

Modes of Work
☑ Mode 0 - Electrically Safe Work Condition
☑ Mode 1 - LOTO & Zero Voltage Verification
QEW Level
QEW 2
Second Person Requirement
Safety Watch
Second Person Identified
Pica
Other Participants
Turner, RC, Justin, Cameron
Affected Persons Notified
Yes

System / Equipment

Switching
Hazardous Switching
Panel / Equipment ID
HVJO1
System Information Review
☑ Arc Flash Labels
☑ 60kv dc junction box
Control of Hazardous Energy
Complex LOTO w/ RI
Equipment Condition
☑ Properly installed
☑ All doors and covers closed and fully latched
☑ No signs of impending failure

Sequence of Job Steps

List basic sequence of steps from start to finish
Check out fall protection and set up to enter man hole. Test air, brief

Control of Work Area

Minimum Approach Boundary
70 inch
Barricade Tape / Attendant
Danger - Red, Attendant

Shock Risk Assessment

System Voltage
60kv
Limited Approach Boundary
60 inches
Restricted Approach Boundary
3 feet, 6 inches
Will the hands enter the RAB
Yes
Voltage Glove Class
2
Will any other part of the body enter the RAB
Yes

Arc Flash Risk Assessment

Incident Energy
18 cal cal/cm2
Arc Flash Boundary
70 inch
Working Distance
24 inches
Arc Flash PPE Level
4
Incident Energy Reduction Measures
2

Capacitor Hazards

Capacitor Bus Voltage
Capacitor Total Stored Energy (Joules)
Discharge Wait Time (Minutes)

Emergency Response Plan

Nearest Landline Location
ALS
Emergency Number to Call
7911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
On site
Fire Extinguisher Location
Sub 3
Contact Release Method Available and Tested
Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?
Insufficient lighting, Confined space, Insufficient/cramped/awkward space

Error Precursors

Task Demands
Unclear goals, roles, or responsibilities
Work Environment
Individual Capabilities
Unfamiliar with, or first time performing task
Human Nature
Error Precursor Mitigations
None

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Removal of conductive articles
☑ Insulated tools
☑ Multimeter and other electrical test instruments

Notes / Other

None

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan