Scope of Work: Rotation and Voltage Check Panel 503A5A Busway
Work Order:
Building: 50B
Person in Charge: Ben Reynolds / Joko
Lead / Supervisor: Cameron, Benjamin
Logged Email: josephpica@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: J. Pica
List Other Participants: TEPS
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: 503A5A
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Complex LOTO w/ RI
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure

Sequence of Job Steps

List basic sequence of steps from start to finish.

Remove Busway Cover Release LOTO Confirm Voltage and Rotation ReEstablish LOTO Secure Panel and Busway

Control of Work Area

Minimum Approach Boundary: 42
Barricade Tape / Attendant: Danger - Red, Attendant

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: .18 cal cal/cm2
Arc Flash Boundary: 6”
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: No Capacitor
Capacitor total stored energy (joules): No Capacitor
Discharge wait time (minutes): No Capacitor

Emergency Response Plan

Nearest Landline Location: Room 1275
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Wall Mount
Fire Extinguisher Location: Wall Mount
Contact release method available and tested: Upstream breaker or switch, Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Maintain Comm RI Job Scope

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Multimeter and other electrical test instruments

Notes / Other

None

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1