Time / Date: 9/23/2024 13:49:10
|
JSP ID: 2954
|
|
Scope of Work: Add 30 A two pole twist lock receptacle to existing circuits and jbox in ceiling.
|
|
|
Work Order: 396425
|
Building: 15
|
|
Person in Charge: Robert Ralph
|
Lead / Supervisor: Keusch, Justen
|
|
Logged Email: RobertRalph@lbl.gov
|
Division: ALS
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
|
Second Person Requirement: Standby Person
|
|
|
Second Person Identified: Jared Tissot
|
|
|
List Other Participants:
|
|
|
Affected Persons Notified: Yes
|
|
|
Switching: No Switching Required
|
Panel / Equipment ID: E362A1A
|
|
System Information Review: Panel Schedules
|
|
|
Control of Hazardous Energy: Simple LOTO
|
|
|
Equipment Condition: Not energizing equipment for the first time, or after electrical repair
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
1. Join LOTO 2. Perform ZVV on conductors at existing jbox. 3. Begin installing conduit 4. Pull conductors 5 install receptacle 6. Make up jbox and remove personal locks. |
Control of Work Area
|
Minimum Approach Boundary: 42”
|
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
|
System Voltage: 120/208 V ac
|
|
Limited Approach Boundary: 42 inches
|
|
Restricted Approach Boundary: 12 inches
|
|
Will the hands enter the RAB: Yes
|
|
Voltage Glove Class: 00
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 9.84 cal cal/cm2
|
|
Arc Flash Boundary: 58”
|
|
Working Distance: No Arc Flash Hazard Present
|
|
Arc Flash PPE Level: 2
|
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
|
Capacitor Bus Voltage:
|
|
Capacitor total stored energy (joules):
|
|
Discharge wait time (minutes):
|
Emergency Response Plan
|
Nearest Landline Location: Inside this room
|
|
Emergency Number to Call: 911
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: 15 lobby
|
|
Fire Extinguisher Location: In this room
|
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
|
Task Demands:
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature:
|
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Multimeter and other electrical test instruments |
Notes / Other
|
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |