Time / Date: 9/23/2024 13:49:10
|
JSP ID: 2954
|
Scope of Work: Add 30 A two pole twist lock receptacle to existing circuits and jbox in ceiling.
|
|
Work Order: 396425
|
Building: 15
|
Person in Charge: Robert Ralph
|
Lead / Supervisor: Keusch, Justen
|
Logged Email: RobertRalph@lbl.gov
|
Division: ALS
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Jared Tissot
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: No Switching Required
|
Panel / Equipment ID: E362A1A
|
System Information Review: Panel Schedules
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1. Join LOTO 2. Perform ZVV on conductors at existing jbox. 3. Begin installing conduit 4. Pull conductors 5 install receptacle 6. Make up jbox and remove personal locks. |
Control of Work Area
Minimum Approach Boundary: 42”
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 9.84 cal cal/cm2
|
Arc Flash Boundary: 58”
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Inside this room
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 15 lobby
|
Fire Extinguisher Location: In this room
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |