Time / Date: 10/4/2024 9:44:12
JSP ID: 2993
Scope of Work: Close circuit Breaker #10 and verify receptacle is working properly.
Work Order: 396425
Building: 15
Person in Charge: Robert Ralph
Lead / Supervisor: Combs, Everett
Logged Email: RobertRalph@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Standby Person
Second Person Identified: Chris Nelson
List Other Participants:
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: E362A1A
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

1.Put on PPE 2.)close breaker #10 3.) verify receptacle is working properly.4.) let customer power restored.

Control of Work Area

Minimum Approach Boundary: 42ā€
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 00
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 9.84 cal/cm2
Arc Flash Boundary: 58ā€
Working Distance: 18 inches
Arc Flash PPE Level: 4
Incident Energy Reduction Measures: 00

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: I’m this room
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Lobby of 15
Fire Extinguisher Location: In this room
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Everything is good

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov