Time / Date: 12/5/2022 9:21:39
|
JSP ID: 304
|
Scope of Work: Replace breaker in panel E490A1B1A ctkb 7. Switch manual transfer switch and LOTO at that point for ZVV.
|
|
Work Order: 304248
|
Building:
|
Person in Charge: Anthony Pilz
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: apilz@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Armand Uribe
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: E490A1B1A
|
System Information Review:
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Don PPE, Establish boundaries and safety watch. AED and phone located in same room. We will switch the transfer switch to the OFF position and Lock out there. We will ZVV the panel and establish electrically safe condition. Then perform work. And close up panel. Don PPE and switch power back at the manual transfer switch. |
Control of Work Area
Minimum Approach Boundary: 8 feet
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: Avoid contact
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 11.1 cal/cm2
|
Arc Flash Boundary: 62 inches
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Same room 135
|
Emergency Number to Call: 510 6314372
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Across hall in mech room
|
Fire Extinguisher Location: In hallway outside of room
|
Contact release method available and tested:
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient lighting |
Error Precursors
Task Demands:
|
Work Environment: Distractions/interruptions, Unexpected equipment conditions
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Brought a light stand for the lighting issue. |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: