Time / Date: 12/6/2022 9:19:18
|
JSP ID: 310
|
Scope of Work: Preventing maintenance on AC equipment
|
|
Work Order: 292354
|
Building:
|
Person in Charge: Solis
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: jrsolis@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified:
|
|
List Other Participants: Juan Garcia
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 342A1A7A40A/AC1 B80A
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Identify equipment, isolate energy source using loto procedures, visual inspection and main components checked up, securing power wires screw connectors , replacing air filters , cleaning condenser units , removal of loto and equipment performance testing. |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/240 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 0.65 cal/cm2
|
Arc Flash Boundary: 12
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Room 100B
|
Emergency Number to Call: 7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Building 15 main entrance
|
Fire Extinguisher Location: Room 100B
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location, Fall hazard |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Loosing balance on top of latter ,sharp edges ,falling covers, dusty filters. |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |