Logo

QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 12/2/2024 9:27:31
JSP ID: 3155
Scope of Work: PM B74A AC001

General Information

Work Order
401304
Building
B74A
Person in Charge
Larry Antles
Lead / Supervisor
Delgado, Alex
Logged Email
leantles@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 0 - Electrically Safe Work Condition
☑ Mode 1 - LOTO & Zero Voltage Verification
QEW Level
QEW 2
Second Person Requirement
Not Required
Second Person Identified
Other Participants
Affected Persons Notified
N/A

System / Equipment

Switching
Non-Hazardous Switching
Panel / Equipment ID
47a5a9a1a/B74A AC 001
System Information Review
☑ Panel Schedules
Control of Hazardous Energy
Complex LOTO (requires LP, CLP, FLP)
Equipment Condition
☑ Properly installed
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
LOTO ZVV equipment check and tighten electrical

Control of Work Area

Minimum Approach Boundary
42”
Barricade Tape / Attendant
Danger - Red

Shock Risk Assessment

System Voltage
120/208 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
12 inches
Will the hands enter the RAB
Yes
Voltage Glove Class
0
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
No arc flash hazard cal/cm2
Arc Flash Boundary
No arc flash hazard
Working Distance
18 inches
Arc Flash PPE Level
2
Incident Energy Reduction Measures
0

Capacitor Hazards

Capacitor Bus Voltage
No
Capacitor Total Stored Energy (Joules)
No
Discharge Wait Time (Minutes)
No

Emergency Response Plan

Nearest Landline Location
B74A Hallway
Emergency Number to Call
6999
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
AT unit
Fire Extinguisher Location
On service truck
Contact Release Method Available and Tested
Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?
Fall hazard

Error Precursors

Task Demands
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
Electrical ladders slips trips and falls

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Removal of conductive articles
☑ Insulated tools
☑ Multimeter and other electrical test instruments

Notes / Other

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan