Time / Date: 12/3/2024 8:17:28
|
JSP ID: 3160
|
Scope of Work: Disconnect perm power and put temp power on all 4 FA panels off same breaker panel
|
|
Work Order: 406704
|
Building: B50B
|
Person in Charge: Ben Agas and Ed Bekheet
|
Lead / Supervisor: Baird, Shawn
|
Logged Email: edbekheet@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: Ben Agas
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: No Switching Required
|
Panel / Equipment ID: E38A9A1A. 21,22,24 and 2
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Exclusive Control of Plug
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1. Put LOTO on building LOTO 2. Perform ZVV on all 4 FA panels 3. Hook up temp power cord to all 4 panels while unplugged and while having control over temp power 4. Run temp power cord and plug into power for all 4 panels 5. Verify units are on |
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 7.98 cal/cm2
|
Arc Flash Boundary: 59
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: By FACP in Rm 243
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: B50B by 1st floor elevator
|
Fire Extinguisher Location: Near FACP
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient lighting, None |
Error Precursors
Task Demands: Time pressure (in a hurry), High workload (memory requirements), Simultaneous or multiple tasks
|
Work Environment: Obscure electrical supplies or configurations
|
Individual Capabilities:
|
Human Nature: Stress (limits attention)
|
Error Precursor Mitigations:
Reviewed error precursors |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |