Time / Date: 12/4/2024 8:42:39
|
JSP ID: 3163
|
Scope of Work: Isolate energy source at panel 347A28A circuit 11 for receptacle on 2nd floor ALS building 6 lobby. LOTO, ZVV and remove receptacle faceplate.
|
|
Work Order:
|
Building: 6
|
Person in Charge: Dave Davis
|
Lead / Supervisor: Combs, Everett
|
Logged Email: ddavis@lbl.gov
|
Division: ALS
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified:
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 347A28A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Verify circuit and panel, use appropriate ppe for simple LOTO, perform LOTO, attach lock, zvv, remove faceplate |
Control of Work Area
Minimum Approach Boundary: 42in
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 0.13 cal/cm2
|
Arc Flash Boundary: 5in
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Al’s building 6 rm2101
|
Emergency Number to Call: 7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Al’s 1st fl lobby
|
Fire Extinguisher Location: 2nd fl lobby
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands: Repetitive actions or monotony
|
Work Environment: Distractions/interruptions
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Maintain focus |
PPE Inspections
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |