Time / Date: 12/4/2024 9:12:11
|
JSP ID: 3165
|
Scope of Work: Apply simple LOTO, ZVV and airgap furniture whip in order for contractor to install new power device on the partition wall for future phone booth. Release LOTO and test power devices.
|
|
Work Order: 411321
|
Building: 033
|
Person in Charge: Alejandro Lopez
|
Lead / Supervisor: Ramer, Robert
|
Logged Email: Alopez2@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Shane Miller
|
|
List Other Participants: none
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 637A3A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Apply simple LOTO, ZVV, airgap partition furniture, re-make wire connections and remove LOTO. |
Control of Work Area
Minimum Approach Boundary: 12 inches+
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 0.11 cal/cm2
|
Arc Flash Boundary: 5 inches.
|
Working Distance: 18 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage: n/a
|
Capacitor total stored energy (joules): n/a
|
Discharge wait time (minutes): n/a
|
Emergency Response Plan
Nearest Landline Location: cell phone
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: main hallway on second floor
|
Fire Extinguisher Location:
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
none |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
none
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |