Time / Date: 12/20/2024 8:40:45
JSP ID: 3221
Scope of Work: Remove and replace juice box with xeal.
Work Order: 413181
Building: 76
Person in Charge: Nick g
Lead / Supervisor: Secheck, Stephen
Logged Email: ngripe@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Beau erwin
List Other Participants:
Affected Persons Notified: N/A
Switching: Non-Hazardous Switching
Panel / Equipment ID: 501A7A/17
System Information Review: Panel Schedules
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure

Sequence of Job Steps

List basic sequence of steps from start to finish.

Loto. Zvv. R and R. Release loto. Re energize

Control of Work Area

Minimum Approach Boundary: 60in
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: No
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 8.03 cal/cm2
Arc Flash Boundary: 51
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: Inside 76
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: 76 hall
Fire Extinguisher Location: By door
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Heavy traffic

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Na

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov