Time / Date: 12/8/2022 7:47:13
|
JSP ID: 324
|
Scope of Work: 1. Remove admin lock from M31A15/70A-GP-50
2. Apply LOTO lock/hasp to M31A15A/70A-GP-50
3. With arc rated ppe & shock protection, perform ZW at 70A-GP-50 DISC and adjacent j-box.
4. ESWC / LOTO Safe Zone established at 70A-GP-50 DISC and adjacent j-box. Perform electrical installation work as required.
5. Remove LOTO from M31A15A/70A-GP-50
6. Replace admin lock on M31A15A/70A-GP-50
|
|
Work Order: 294555
|
Building:
|
Person in Charge: Anthony Pilz
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: apilz@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Armand Uribe
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: No Switching Required
|
Panel / Equipment ID: M31A15A/70A-GP-50
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1. Remove admin lock from M31A15/70A-GP-50 2. Apply LOTO lock/hasp to M31A15A/70A-GP-50 3. With arc rated ppe & shock protection, perform ZW at 70A-GP-50 DISC and adjacent j-box. 4. ESWC / LOTO Safe Zone established at 70A-GP-50 DISC and adjacent j-box. Perform electrical installation work as required. 5. Remove LOTO from M31A15A/70A-GP-50 6. Replace admin lock on M31A15A/70A-GP-50 |
Control of Work Area
Minimum Approach Boundary: 120
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: None
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 9.2 cal/cm2
|
Arc Flash Boundary: 49 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Upstairs in main e room
|
Emergency Number to Call: 510 6314372
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Upstairs in elevator lobby
|
Fire Extinguisher Location: In area
|
Contact release method available and tested:
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location, Insufficient/cramped/awkward space, Noisy environment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
All errors are mitigated. |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |