					Time / Date: 2/18/2025 8:31:05				 				
				 | 
				
				 
					JSP ID: 3391				 
				 | 
				
| 
				 
					Scope of Work: PM				 				
				 | 
				|
| 
				 
					Work Order: 399136				 				
				 | 
				
				 
					Building: 70A				 				
				 | 							
				
| 
				 
					Person in Charge: Capeto 				 				
				 | 
				
				 
					Lead / Supervisor: Delgado, Alex				 
				 | 
				
| 
				 
					Logged Email: mcapeto@lbl.gov				 				
				 | 
				
				 
					Division: Facilities				 				
				 | 
				
| 
				 
					QEW Level: QEW 2				 				
				 | 
				
				 | 
				
| 
				 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification				 				
				 | 
				|
| 
				 
					Second Person Requirement: Standby Person				 				
				 | 
				|
| 
				 
					Second Person Identified: Walker				 				
				 | 
				|
| 
				 
					List Other Participants: High voltage electricians, plumbers 				 				
				 | 
				|
| 
				 
					Affected Persons Notified: Yes				 				
				 | 
				|
| 
				 
					Switching: Hazardous Switching				 				
				 | 
				
				 
					Panel / Equipment ID: 001 70A/ 70A ARU 001				 
				 | 
				
| 
				 
					System Information Review: Arc Flash Labels				 				
				 | 
				|
| 
				 
					Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)				 				
				 | 
				|
| 
				 
					Equipment Condition: 				 				
				 | 
				|
Sequence of Job Steps
| 
				 
					List basic sequence of steps from start to finish. 				
				Switch, LOTO, ZVV, PM, release LOTO, switch, verify ops  | 
				
Control of Work Area
| 
				 
					Minimum Approach Boundary: 42”				 				
				 | 
				
| 
				 
					Barricade Tape / Attendant: Attendant				 
				 | 
				
Shock Risk Assessment
| 
				 
					System Voltage: 120/208 V ac				 				
				 | 
				
| 
				 
					Limited Approach Boundary: 42 inches				 				
				 | 
				
| 
				 
					Restricted Approach Boundary: 3 inches				 				
				 | 
				
| 
				 
					Will the hands enter the RAB: Yes				 				
				 | 
				
| 
				 
					Voltage Glove Class: 0				 				
				 | 
				
| 
				 
					Will any other part of the body enter the RAB: No				 				
				 | 
				
Arc Flash Risk Assessment
| 
				 
					Incident Energy: 100.2 cal cal/cm2
				 				
				 | 
				
| 
				 
					Arc Flash Boundary: 208”				 				
				 | 
				
| 
				 
					Working Distance: 24 inches				 				
				 | 
				
| 
				 
					Arc Flash PPE Level: Minimum PPE for Electrical Work				 				
				 | 
				
| 
				 
					Incident Energy Reduction Measures: 0				 				
				 | 
				
Capacitor Hazards
| 
				 
					Capacitor Bus Voltage:  NA				 				
				 | 
				
| 
				 
					Capacitor total stored energy (joules): NA				 				
				 | 
				
| 
				 
					Discharge wait time (minutes): NA				 				
				 | 
				
Emergency Response Plan
| 
				 
					Nearest Landline Location: Hallway 				 				
				 | 
				
| 
				 
					Emergency Number to Call: 911				 				
				 | 
				
| 
				 
					Sufficient cell phone signal? Yes				 				
				 | 
				
| 
				 
					Clear exit path? Yes				 				
				 | 
				
| 
				 
					AED Location: Lobby				 				
				 | 
				
| 
				 
					Fire Extinguisher Location: @ exit/ entrance 				 				
				 | 
				
| 
				 
					Contact release method available and tested: Voltage gloves				 				
				 | 
				
Environmental Conditions
| 
				 
					Does the environment present additional hazards that should be addressed? 				
				Confined space, Insufficient/cramped/awkward space, Heavy traffic, Lookalike equipment, Noisy environment  | 
				
Error Precursors
| 
				 
					Task Demands: 				 				
				 | 
				
| 
				 
					Work Environment: 				 				
				 | 
				
| 
				 
					Individual Capabilities: 				 				
				 | 
				
| 
				 
					Human Nature: 				 				
				 | 
				
| 
				 
					Error Precursor Mitigations:  				
				Reviewed  | 
				
PPE Inspections
| 
				 
					Safety glasses (ANSI Z87), 				
				Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments  | 
				
Notes / Other
| 
				 
					High voltage electricians to switch and place into maintenance mode which reduces arc flash to 1 calorie; ZVV conducted under maintenance mode				 				
				 | 
				
Perform Job Breifing
| 
				 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  				
				A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov  | 
				