Time / Date: 12/12/2022 13:17:07
|
JSP ID: 344
|
Scope of Work: LOTO and ZVV DI Water Chiller to separate motor terminations to replace motor
|
|
Work Order: W0304680
|
Building:
|
Person in Charge: Joseph Colmenares
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: jcolmenares@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Pica
|
|
List Other Participants: PMTs enroute
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 72A7A4A breaker34 Local Disconnect
|
System Information Review: Panel Schedules, Local Labeling
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Switch Panel 72A7A4A bkr 34 Disconnect Lock on ZVV Simple LOTO For DI Water Chiller separate motor terminations replace motor Confirm Operation Restore to Service |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 5.6cal cal/cm2
|
Arc Flash Boundary: 42”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: 2nd floor Rear Entrance (20’)
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Wall Mount in Hall & Crew Carry
|
Fire Extinguisher Location: Wall Mount
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Second Checks |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |