Time / Date: 3/3/2025 18:36:12
|
JSP ID: 3466
|
Scope of Work: Inspection BJ1--28/30 Air Flow Switch
|
|
Work Order: NA
|
Building: 88
|
Person in Charge: Michel Kireeff Covo
|
Lead / Supervisor: Other
|
Logged Email: mkireeffcovo@lbl.gov
|
Division: Other
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: NA
|
|
List Other Participants: Brendan Ford, Brien Ninemire, Erik Line, Michel Kireeff Covo
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: Main Magnet Power Supply
|
System Information Review: Single Line Drawing
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1. Turn off Main Magnet Power supply 2. Notify control Room 3. LOTO Control Power A3032 P[2] 18 4. Open side of the enclosure and inspect the BJ1--28/30 Air Flow Switch 5. If needed, step aside and turn on the blower to check if the switch closes 6. Repair the switch if needed 7. Turn off the blower 8. Place cover back 9. Remove LOTO and restore Control Power A3032 P[2] 18 10. Notify control Room 11. Turn on Main Magnet Power supply |
Control of Work Area
Minimum Approach Boundary: 42"
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: NA cal/cm2
|
Arc Flash Boundary: NA
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: NA
|
Capacitor total stored energy (joules): NA
|
Discharge wait time (minutes): NA
|
Emergency Response Plan
Nearest Landline Location: PIT phone
|
Emergency Number to Call: X911
|
Sufficient cell phone signal? No
|
Clear exit path? Yes
|
AED Location: Building Entrance
|
Fire Extinguisher Location: Corridor
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient lighting, Fall hazard |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities: Unfamiliar with, or first time performing task
|
Human Nature:
|
Error Precursor Mitigations:
First time performing task- the air flow switch location will be recorded for next time. |
PPE Inspections
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |