Time / Date: 3/4/2025 12:34:08
|
JSP ID: 3470
|
Scope of Work: Complete Lotto LP 3248
|
|
Work Order: Training
|
Building: 75a
|
Person in Charge: Mike Rose
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: avery.turner98@gmail.com
|
Division: Facilities
|
QEW Level: QEW 3
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: Joe Pica
|
|
List Other Participants: None
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: Bus 101
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO w/ RI
|
|
Equipment Condition: All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Perform PPE inspection and equipment inspection then ZVV bus 101 so we can install ground clusters in order to bring Bus 101 to a safe working condition so we can test the cables an make up and terminate |
Control of Work Area
Minimum Approach Boundary: 27.2
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 12,470 V ac
|
Limited Approach Boundary: 60 inches
|
Restricted Approach Boundary: 2 feet, 2 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 2
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 28.1 cal/cm2 cal/cm2
|
Arc Flash Boundary: 233
|
Working Distance: 36 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 2
|
Capacitor Hazards
Capacitor Bus Voltage: None
|
Capacitor total stored energy (joules): None
|
Discharge wait time (minutes): None
|
Emergency Response Plan
Nearest Landline Location: Not working
|
Emergency Number to Call: 6911/911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Onsite
|
Fire Extinguisher Location: Outside of the door
|
Contact release method available and tested: Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities: Unfamiliar with, or first time performing task
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools |
Notes / Other
Wiped down shot gun
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |