Time / Date: 3/5/2025 8:17:33
|
JSP ID: 3472
|
Scope of Work: switch BA panel B030714 off and ZVV for ALS to have Data workers pull a new networking cable in This Rack. Via Breaker # 27 in Panel 324A
|
|
Work Order: 415062
|
Building: 6 ALS
|
Person in Charge: Christopher Nelson
|
Lead / Supervisor: Combs, Everett
|
Logged Email: cnelson@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Alex lopez
|
|
List Other Participants: William and Mary Chan
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 324A / B030714
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Meet with ALS EM RI with lock box briefing fill out JSP pick PPE Switch breaker #27 panel 324A and LOTO then ZVV rack B0307. Remove lock and turn over to ri. Come back to switch back on at 1pm today |
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: Yes
|
Arc Flash Risk Assessment
Incident Energy: 16.7 cal/cm2
|
Arc Flash Boundary: 77
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: No
|
Capacitor total stored energy (joules): No
|
Discharge wait time (minutes): No
|
Emergency Response Plan
Nearest Landline Location: Within the area of booster pit where we are working
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 15 lobby
|
Fire Extinguisher Location: By the ZVV point
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Lookalike equipment |
Error Precursors
Task Demands: Simultaneous or multiple tasks
|
Work Environment: Distractions/interruptions
|
Individual Capabilities:
|
Human Nature: Habit patterns
|
Error Precursor Mitigations:
Keep in control and contact with area and participating others |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
Routine WO jsp
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |