Time / Date: 12/13/2022 13:10:41
|
JSP ID: 351
|
Scope of Work: Preventive maintenance
|
|
Work Order: W0299080
|
Building:
|
Person in Charge: Darren krans
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: juanjuarez37@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Juan garcia
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: E35B15A1A
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Id power source , implement LOTO procedures ZVV , perform visual inspection ,tight in screws,check air blower belt, replace air filters, clear condenser drain pipe, reconnect power source to unit, ensure proper performance and temperatures after service. |
Control of Work Area
Minimum Approach Boundary: 106
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 29.5 cal/cm2
|
Arc Flash Boundary: 106
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: 1st floor
|
Emergency Number to Call: 7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 1st floor
|
Fire Extinguisher Location: Next to Ac
|
Contact release method available and tested: Rescue hook
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient lighting, Fall hazard, Lookalike equipment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Falling off ladder — 2nd person will hold ladder |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |