Time / Date: 3/18/2025 10:50:12
|
JSP ID: 3513
|
Scope of Work: Switch Tripped. Breaker
|
|
Work Order: 415067
|
Building: ALS 6
|
Person in Charge: Mayumi Taylor
|
Lead / Supervisor: Combs, Everett
|
Logged Email: cnelson@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Christopher Nelson
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 319A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Fill out JSP contact the people involved with this issue and notify them we are switching. Barricade off area and signage of arc flash boundary. Switch when everything is ready and we have on our PPE. Make sure breaker is reset. |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: No Shock Hazard Present
|
Limited Approach Boundary: Na
|
Restricted Approach Boundary: Na
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 22.5 cal/cm2
|
Arc Flash Boundary: 113 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 1
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: At sector 6 labyrinth door
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Lobby of als 6
|
Fire Extinguisher Location: Next to land line
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient/cramped/awkward space, Scaffolding is close by |
Error Precursors
Task Demands:
|
Work Environment: Distractions/interruptions
|
Individual Capabilities:
|
Human Nature: Mind-set
|
Error Precursor Mitigations:
Keep your cool don’t rush |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles |
Notes / Other
Just switching
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |