Time / Date: 3/21/2025 14:52:31
|
JSP ID: 3530
|
Scope of Work: Troubleshoot VFD alarms in CDUs D100 and D101
|
|
Work Order: NA
|
Building: B59
|
Person in Charge: Ernie Jew
|
Lead / Supervisor: Grounds, Jeff
|
Logged Email: ejew@lbl.gov
|
Division: Comp Sci
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Eric Lucas
|
|
List Other Participants: HPE site engineers (Vendor)
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 692A4A & 628A7A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO w/ RI
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Notify Control Room of work on CDU D100 Set up barricade around CDU D100 Switch power off to CDU D100 (628A7A-40 & 692A4A-40) Hang Group LOTO lock and tag at 628A7A-40 and place key in LOTO lock box Hang Group LOTO lock and tag at 692A4A-40 and place key in LOTO lock box Hang RI lock and tag on lock box ZVV at VFD cabinet at CDU D100 Brief HPE/Cray workers and have them hang LOTO lock and tag on lock box Get QEW to cover CDU with 600 volt sheeting with cutout for the two VFD displays Release LOTO and perform partial power restoration Scroll through VFD to troubleshoot CDU D100 alarm When troubleshooting is complete, switch power off to CDU D100 (628A7A-40 and 692A4A-40) Hang Group LOTO lock and tag at 628A7A-40 and place key in LOTO lock box Hang Group LOTO lock and tag at 692A4A-40 and place key in LOTO lock box Hang RI lock and tag on lock box ZVV at VFD cabinet at CDU D100 Remove 600 volt sheeting and close CDU D100 enclosure door When work is complete - Notify Control Room that power will be restored to CDU D100 Release LOTO and switch power on to CDU D100 Remove Barricades Work is complete |
Control of Work Area
Minimum Approach Boundary: 42"
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 1.24 cal/cm2
|
Arc Flash Boundary: 18"
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 1
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: NA
|
Capacitor total stored energy (joules): NA
|
Discharge wait time (minutes): NA
|
Emergency Response Plan
Nearest Landline Location: Control Room
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Wall next to 2nd floor lobby
|
Fire Extinguisher Location: Wall next to 2nd floor lobby
|
Contact release method available and tested: Rescue hook
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Lookalike equipment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
verify equipment worked on is identified and agreed on with stand by person for lookalike eqipment |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: