Time / Date: 3/31/2025 7:16:29
|
JSP ID: 3551
|
Scope of Work: Install Data Logger in Panel
|
|
Work Order: W0415665
|
Building: 71A
|
Person in Charge: Alma Armenta
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: alarmentaduran@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Andrew Southward
|
|
List Other Participants: Fire alarm
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 116A1A40A / 116A1A
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Set up work area with barricade tape, inspect panel, access panel, install data logger, verify operation, close panel, inspect work area for safety. |
Control of Work Area
Minimum Approach Boundary: 49”
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 5.92 / <1.2 cal cal/cm2
|
Arc Flash Boundary: 49” /
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2+
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: None
|
Capacitor total stored energy (joules): None
|
Discharge wait time (minutes): None
|
Emergency Response Plan
Nearest Landline Location: Cell phone
|
Emergency Number to Call: 510-486-7911 (911 from Lab Phone)
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: On hand
|
Fire Extinguisher Location: By back door of 71A
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Lookalike equipment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: