					Time / Date: 12/16/2022 10:44:21				 				
				 | 
				
				 
					JSP ID: 360				 
				 | 
				
| 
				 
					Scope of Work: Assessing 88 Ahu 15 not working. 				 				
				 | 
				|
| 
				 
					Work Order: 305633				 				
				 | 
				
				 
					Building: 				 				
				 | 							
				
| 
				 
					Person in Charge: Juan garcia				 				
				 | 
				
				 
					Lead / Supervisor: Delgado, Alex				 
				 | 
				
| 
				 
					Logged Email: jwwalker@lbl.gov				 				
				 | 
				
				 
					Division: Facilities				 				
				 | 
				
| 
				 
					QEW Level: QEW 2				 				
				 | 
				
				 | 
				
| 
				 
					Modes of Work: Mode 1 - LOTO & Zero Voltage Verification				 				
				 | 
				|
| 
				 
					Second Person Requirement: Standby Person				 				
				 | 
				|
| 
				 
					Second Person Identified: Justin walker				 				
				 | 
				|
| 
				 
					List Other Participants: N/A				 				
				 | 
				|
| 
				 
					Affected Persons Notified: Yes				 				
				 | 
				|
| 
				 
					Switching: Non-Hazardous Switching				 				
				 | 
				
				 
					Panel / Equipment ID: M80A2A21A1A				 
				 | 
				
| 
				 
					System Information Review: Panel Schedules, Arc Flash Labels				 				
				 | 
				|
| 
				 
					Control of Hazardous Energy: Simple LOTO				 				
				 | 
				|
| 
				 
					Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 				
				 | 
				|
Sequence of Job Steps
| 
				 
					List basic sequence of steps from start to finish. 				
				Go over job scope, assess equipment location, analyze hazards check arc flash lanes for proper ppe. It’s a simple loto. Apply loto verify zvv secure area and perform inspection on 88 Ahu to determine issue. Repair if possible. If not report follow up if neeede  | 
				
Control of Work Area
| 
				 
					Minimum Approach Boundary: 42				 				
				 | 
				
| 
				 
					Barricade Tape / Attendant: Warning - Orange				 
				 | 
				
Shock Risk Assessment
| 
				 
					System Voltage: 277/480 V ac				 				
				 | 
				
| 
				 
					Limited Approach Boundary: 42 inches				 				
				 | 
				
| 
				 
					Restricted Approach Boundary: 12 inches				 				
				 | 
				
| 
				 
					Will the hands enter the RAB: Yes				 				
				 | 
				
| 
				 
					Voltage Glove Class: 00				 				
				 | 
				
| 
				 
					Will any other part of the body enter the RAB: No				 				
				 | 
				
Arc Flash Risk Assessment
| 
				 
					Incident Energy: 5.04 cal/cm2 cal/cm2
				 				
				 | 
				
| 
				 
					Arc Flash Boundary: 40				 				
				 | 
				
| 
				 
					Working Distance: 18 inches				 				
				 | 
				
| 
				 
					Arc Flash PPE Level: 2				 				
				 | 
				
| 
				 
					Incident Energy Reduction Measures: 00				 				
				 | 
				
Capacitor Hazards
| 
				 
					Capacitor Bus Voltage: N/A				 				
				 | 
				
| 
				 
					Capacitor total stored energy (joules): N/A				 				
				 | 
				
| 
				 
					Discharge wait time (minutes): N/A				 				
				 | 
				
Emergency Response Plan
| 
				 
					Nearest Landline Location: Offices 50 feet away				 				
				 | 
				
| 
				 
					Emergency Number to Call: 911				 				
				 | 
				
| 
				 
					Sufficient cell phone signal? Yes				 				
				 | 
				
| 
				 
					Clear exit path? Yes				 				
				 | 
				
| 
				 
					AED Location: 1st floor lobby				 				
				 | 
				
| 
				 
					Fire Extinguisher Location: Room 238				 				
				 | 
				
| 
				 
					Contact release method available and tested: Upstream breaker or switch				 				
				 | 
				
Environmental Conditions
| 
				 
					Does the environment present additional hazards that should be addressed? 				
				Confined space  | 
				
Error Precursors
| 
				 
					Task Demands: 				 				
				 | 
				
| 
				 
					Work Environment: 				 				
				 | 
				
| 
				 
					Individual Capabilities: 				 				
				 | 
				
| 
				 
					Human Nature: 				 				
				 | 
				
| 
				 
					Error Precursor Mitigations:  				
				No error precursors on this job  | 
				
PPE Inspections
| 
				 | 
				
Notes / Other
| 
				 | 
				
Perform Job Breifing
| 
				 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  				
				A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov  | 
				