Time / Date: 4/10/2025 7:06:04
|
JSP ID: 3603
|
Scope of Work: Establish LP-5588, LP-5593, LP-5590, LP-5451
|
|
Work Order: W0426583, W0426585, W0430167, W0426582
|
Building: 33
|
Person in Charge: Alma Armenta
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: alarmentaduran@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Andrew Southward
|
|
List Other Participants: Taft
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 637A-ckt 16, 637A15A-ckt 31, 635A1A4A31A-ckt 1, 637A21A-ckt 4, 8, 12, 29, 31, 33, E642A-ckt4.
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
|
|
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Verify equipment to de-energize, don appropriate PPE, switch, loto, ZVV, hang gold locks until work is complete to release. |
Control of Work Area
Minimum Approach Boundary: 104”
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 14.4 / 0.41 / 0.32 / 14.6 cal/cm2
|
Arc Flash Boundary: 103” / 9” / 8” / 104”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 3
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: None
|
Capacitor total stored energy (joules): None
|
Discharge wait time (minutes): None
|
Emergency Response Plan
Nearest Landline Location: Cell phone
|
Emergency Number to Call: 5104867911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: On hand
|
Fire Extinguisher Location: In corridor 220A
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Lookalike equipment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |