Time / Date: 4/15/2025 12:39:06
JSP ID: 3636
Scope of Work: Energize ckt 11 in EU671A11A2A
Work Order: W0412333
Building: 91
Person in Charge: Alma Armenta
Lead / Supervisor: Cameron, Benjamin
Logged Email: alarmentaduran@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition
Second Person Requirement: Standby Person
Second Person Identified: Andrew Southward
List Other Participants:
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: EU671A11A2A
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Exclusive Control of Plug
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Verify circuit to energize, don leather glove & safety glasses, switch. Report if breaker does not hold.

Control of Work Area

Minimum Approach Boundary: 42”
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: Yes

Arc Flash Risk Assessment

Incident Energy: 0.21 cal/cm2
Arc Flash Boundary: 7”
Working Distance: 18 inches
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: None
Capacitor total stored energy (joules): None
Discharge wait time (minutes): None

Emergency Response Plan

Nearest Landline Location: Cell phone
Emergency Number to Call: 5104867911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: On hand
Fire Extinguisher Location: In hallway
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov