|
Time / Date: 4/18/2025 6:59:54
|
JSP ID: 3646
|
|
Scope of Work: LOTO and ZVV bl-2 for motor repair and VFD screen replacement
|
|
|
Work Order: W0433595
|
Building: 85
|
|
Person in Charge: AndrewSouthward
|
Lead / Supervisor: Cameron, Benjamin
|
|
Logged Email: amsouthward@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
|
Second Person Requirement: Standby Person
|
|
|
Second Person Identified: Alma Duran
|
|
|
List Other Participants: PMT’s
|
|
|
Affected Persons Notified: Yes
|
|
|
Switching: Hazardous Switching
|
Panel / Equipment ID: EM460A5A1A9A
|
|
System Information Review: Panel Schedules
|
|
|
Control of Hazardous Energy: Simple LOTO
|
|
|
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
Switch off breaker, ZVV in VFD cabinet, change out screen for VFD, air gap motor, after work is complete connect motor and release LOTO/energize |
Control of Work Area
|
Minimum Approach Boundary: 74”
|
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
|
System Voltage: 277/480 V ac
|
|
Limited Approach Boundary: 42 inches
|
|
Restricted Approach Boundary: 12 inches
|
|
Will the hands enter the RAB: Yes
|
|
Voltage Glove Class: 0
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 15.5 cal/cm2
|
|
Arc Flash Boundary: 74”
|
|
Working Distance: 18 inches
|
|
Arc Flash PPE Level: 3
|
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
|
Capacitor Bus Voltage: Na
|
|
Capacitor total stored energy (joules): Na
|
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
|
Nearest Landline Location: Cell phone
|
|
Emergency Number to Call: 911
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: On hand
|
|
Fire Extinguisher Location: 3rd floor 84
|
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
Lookalike equipment |
Error Precursors
|
Task Demands:
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature:
|
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |
