Time / Date: 4/18/2025 10:50:08
|
JSP ID: 3647
|
Scope of Work: Disconnect wiring between heater ring and Heater control boxes. Unmount boxes and return them to LBL
|
|
Work Order:
|
Building: Pt Reyes Field Site
|
Person in Charge: Todd Wood
|
Lead / Supervisor: Other
|
Logged Email: TJWood@lbl.gov
|
Division: Other
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified:
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: No Switching Required
|
Panel / Equipment ID: PP1-8
|
System Information Review:
|
|
Control of Hazardous Energy: Cord & Plug LOTO
|
|
Equipment Condition:
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1. Establish Loto - Unplug 240 VAC plug, place a cord cap lock and tag. 2. Open enclosure - preform ZVV 3. ensure all breakers in the panel are OFF 4. disconnect phases and ground for the 2 heater circuits. 5. disconnect the low voltage signals from the datalogger 6. apply tape to protect all exposed wire ends 7. remove enclosures from the plywood backpanel |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: 120/240 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: NA cal/cm2
|
Arc Flash Boundary: NA
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: NA
|
Capacitor total stored energy (joules): NA
|
Discharge wait time (minutes): NA
|
Emergency Response Plan
Nearest Landline Location: Pt Reyes House
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location:
|
Fire Extinguisher Location: Barn
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location, Lookalike equipment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Consult task list, verbalize steps |
PPE Inspections
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |