Time / Date: 12/19/2022 9:03:34
|
JSP ID: 369
|
Scope of Work: Perform annual on 64 Aru 004
|
|
Work Order: 299264
|
Building:
|
Person in Charge: Juan Garcia
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: jwwalker@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Justin walker
|
|
List Other Participants: None
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: MCC5181A / 64 ARU 004
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Go over briefing and scope of work. Inspect ppe. And tools, set up barricade tape. Standby person also on site. Put on ppe, switch disconnect located by 64 Aru 004 Apply loto, verify ZVV. Inspect electrical and tighten connections. Take oil sample on compressors. Clean condensor coils. Perform leak check on refrigerant piping. Look for any signs of oil. Inspect fan blades and motors. Wipe down chiller. Remove loto. And verify operations. Clean up area. Submit work log. |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 6.40 cal/cm^2 cal/cm2
|
Arc Flash Boundary: 41 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: Building 64 room 115
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Outside room 142 building 64
|
Fire Extinguisher Location: Inside back door outside room 64/ 102
|
Contact release method available and tested: Upstream breaker or switch, Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
There are areas with uneven surfaces to be mindful of. Also water piping. |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
There are no error precursors first job out the day no pressure or time restraints. Technicians are rested and alert. And are comfortable with job and scope of work |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |