Scope of Work:Investigate loss of power inside the gate house which provided power for networking. Restore power to breaker that was in the off position likely by being bumped as the panel is in a very low spot. The door of the sub panel is taped open due to 2 loto devices on circuit breakers not allowing the panel door to close.
☑ Properly installed ☑ Properly maintained ☑ All doors and covers closed and fully latched ☑ No signs of impending failure ☑ Not energizing equipment for the first time ☑ or after electrical repair
Sequence of Job Steps
List basic sequence of steps from start to finish
Assess local subpanel to take a visual of branch circuit breakers. Switch on Breaker that was in the off position. Relabel panel to correct panel name. Post correct current panel schedule.
Control of Work Area
Minimum Approach Boundary
Barricade Tape / Attendant
Shock Risk Assessment
System Voltage
120/208 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
12 inches
Will the hands enter the RAB
No
Voltage Glove Class
0
Will any other part of the body enter the RAB
No
Arc Flash Risk Assessment
Incident Energy
1.2 cal/cm2
Arc Flash Boundary
42"
Working Distance
No Arc Flash Hazard Present
Arc Flash PPE Level
Minimum PPE for Electrical Work
Incident Energy Reduction Measures
0
Capacitor Hazards
Capacitor Bus Voltage
NA
Capacitor Total Stored Energy (Joules)
NA
Discharge Wait Time (Minutes)
NA
Emergency Response Plan
Nearest Landline Location
inside gate shack
Emergency Number to Call
911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
B88
Fire Extinguisher Location
inside gatehouse
Contact Release Method Available and Tested
Voltage gloves
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Heavy traffic
Error Precursors
Task Demands
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
none needed
PPE Inspections
☑ Safety glasses (ANSI Z87) ☑ Arc-rated clothing (flash suit ☑ daily wear) including face shield ☑ balaclava ☑ hood. ☑ Rubber insulating gloves and leather protectors ☑ Non-melting footwear that fully covers the feet ☑ Removal of conductive articles
Notes / Other
Panel was mislabeled. I updated label on panel and posted the appropriate panel schedule on the door of the sub panel.
Perform Job Briefing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Detailed Scope of Work
Shock and arc flash hazards for each task
Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
Work area controls (barricades, signs, attendants)