Time / Date: 5/14/2025 8:14:54
|
JSP ID: 3731
|
Scope of Work: Dawn the proper PPE and set up barricades, Loto @panel 66A2A14A ckt9, hang red locks. ZVV at bank 96 and panel 96A. Check connection/terminals. Mode 2 release loto and live voltage reading from each phase to neutral and ground at bank 96. Close and secure bank 96. Release LOTO
|
|
Work Order: WO372559
|
Building: 62
|
Person in Charge: Shane Miller
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: spmiller@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: Alex Lopez
|
|
List Other Participants: Steve Sechak
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 66A2A14A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1. Set up barricades for mode 2 work(red tape) 2. Dawn the proper PPE 3.switch at panel 66A2A14A ckt 9 4. Hang red locks 5. ZVV at bank 96 and panel 96A 6. Check connections/ terminals at bank 96 document with photos 7. Mode 2 release Loto and check live voltage readings for every combo of phases to neutral and ground. 8. Apply Loto again at panel 66A2A14A ckt 9 9. Replace covers on bank 96 and at panel 96A 10. Release Loto and clean up |
Control of Work Area
Minimum Approach Boundary: 111 inches
|
Barricade Tape / Attendant: Danger - Red, Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 32.4cal/cm2 cal/cm2
|
Arc Flash Boundary: 111 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: Using cell with good signal
|
Emergency Number to Call: X6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: In vehicle at back door of 62 100’ away
|
Fire Extinguisher Location: Outside room 101 40’ away
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
None
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |