Logo

QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 6/4/2025 12:27:46
JSP ID: 3797
Scope of Work: Plug in mo box and test receptacle for proper voltage

General Information

Work Order
415062
Building
15
Person in Charge
Christopher Nelson
Lead / Supervisor
Combs, Everett
Logged Email
cnelsom@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 2 - Energized Diagnostics
☑ Testing and Troubleshooting
☑ Visual Inspection
QEW Level
QEW 2
Second Person Requirement
Not Required
Second Person Identified
Other Participants
David Davis
Affected Persons Notified

System / Equipment

Switching
Non-Hazardous Switching
Panel / Equipment ID
585A6A
System Information Review
☑ Arc Flash Labels
☑ Pin n sleeve rec and disconnect
Control of Hazardous Energy
LOTO Not Required (Mode 2 or 3 only)
Equipment Condition
☑ Properly installed
☑ Properly maintained
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
Plug in mo box to pin and sleeve receptacle, test receptacle with multi meter

Control of Work Area

Minimum Approach Boundary
Barricade Tape / Attendant
Attendant

Shock Risk Assessment

System Voltage
No Shock Hazard Present
Limited Approach Boundary
None
Restricted Approach Boundary
None
Will the hands enter the RAB
No
Voltage Glove Class
Not Required
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
<1.2 cal/cm2
Arc Flash Boundary
18”
Working Distance
No Arc Flash Hazard Present
Arc Flash PPE Level
Minimum PPE for Electrical Work
Incident Energy Reduction Measures
Not Required

Capacitor Hazards

Capacitor Bus Voltage
Na
Capacitor Total Stored Energy (Joules)
Na
Discharge Wait Time (Minutes)
Na

Emergency Response Plan

Nearest Landline Location
In this room
Emergency Number to Call
911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
In lobby next room over
Fire Extinguisher Location
In room on south outside wall
Contact Release Method Available and Tested
Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?
Noisy environment

Error Precursors

Task Demands
Work Environment
Individual Capabilities
Human Nature
Stress (limits attention)
Error Precursor Mitigations
Keep on the task don’t worry about anything else

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Non-melting footwear that fully covers the feet
☑ Multimeter and other electrical test instruments

Notes / Other

Testing new outlet on mo box for proper voltage

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan