Time / Date: 12/28/2022 7:14:04
|
JSP ID: 387
|
Scope of Work: Switch and Troubleshoot cause of Main MCC trip
|
|
Work Order: W0307275
|
Building:
|
Person in Charge: Joseph Pica (w/ Cameron via phone)
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: josephpica@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 3
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: Justin Solis
|
|
List Other Participants: James Harris
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 304A7A5A7A Main Breaker
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Request Permission to Switch Troubleshoot as necessary to isolate potential fault Report Findings Return to Service as applicable |
Control of Work Area
Minimum Approach Boundary: 42”
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: .4 calories cal/cm2
|
Arc Flash Boundary: 9” (>42” for Second Man)
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Rm 2263 (adjacent)
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Crew Carry
|
Fire Extinguisher Location: Hall
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Verbatim Repeat Back Second Check Availability of Assistance Standing By |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |