Time / Date: 6/30/2025 8:00:15
|
JSP ID: 3886
|
|
Scope of Work: Troubleshoot why Gp 004 breaker has tripped twice.
|
|
|
Work Order:
|
Building: #02
|
|
Person in Charge: Jeff Hendrix
|
Lead / Supervisor: Hendrick, Jeffery
|
|
Logged Email: AJTurner2@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
|
Second Person Requirement: Standby Person
|
|
|
Second Person Identified: Joe colmenares
|
|
|
List Other Participants: None
|
|
|
Affected Persons Notified: Yes
|
|
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 238A9A1A-20,22,24
|
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
|
Control of Hazardous Energy: Simple LOTO
|
|
|
Equipment Condition: All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
Lock out tag out the circuit then ZVV the circuit after we ZVV then check and tighten connections.Megger the circuit then check for phase imbalance. |
Control of Work Area
|
Minimum Approach Boundary: 18
|
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
|
System Voltage: 277/480 V ac
|
|
Limited Approach Boundary: 42 inches
|
|
Restricted Approach Boundary: 3 feet, 6 inches
|
|
Will the hands enter the RAB: No
|
|
Voltage Glove Class: 0
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 0.35 cal/cm2
|
|
Arc Flash Boundary: Nine inches
|
|
Working Distance: 18 inches
|
|
Arc Flash PPE Level: 2
|
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
|
Capacitor Bus Voltage: None
|
|
Capacitor total stored energy (joules): 0
|
|
Discharge wait time (minutes): 0
|
Emergency Response Plan
|
Nearest Landline Location: Cell phone
|
|
Emergency Number to Call: 911
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: On location
|
|
Fire Extinguisher Location: Building 2
|
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
|
Task Demands:
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature:
|
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Multimeter and other electrical test instruments |
Notes / Other
|
None
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: