Time / Date: 7/1/2025 8:53:06
|
JSP ID: 3891
|
Scope of Work: LOTO/ZVV 244A2A-23 and verify 21 has zero voltage
|
|
Work Order: 417097
|
Building: 2
|
Person in Charge: Greg Neidiger
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: gcn@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified:
|
|
List Other Participants:
|
|
Affected Persons Notified: N/A
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 244A2A-23
|
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1) Switch breaker 23 and apply lock and tag 2) Remove admin lock from 21 and apply personal lock 3)Don PPE 4) Open blower e-stop and ZVV circuit 23 5) Open junction box and verify circuit 21 has zero voltage |
Control of Work Area
Minimum Approach Boundary: 124”
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 26.2 cal/cm2
|
Arc Flash Boundary: 124”
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Rm 251
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Elevator lobby
|
Fire Extinguisher Location: Adjacent to panel
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Self review identified no precursors |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
Two OCPD upstream of ZVV point. No arc-flash hazard.
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |