Time / Date: 9/30/2022 8:32:08
|
JSP ID: 39
|
Scope of Work: Troubleshoot ac unit on rooftop.
|
|
Work Order: 295947
|
Building:
|
Person in Charge: Antonio collado
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: Acollado@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Michael capeto
|
|
List Other Participants:
|
|
Affected Persons Notified:
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 49a2a6a ckt 28 / 46 ac 0121
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
|
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 12.9 cal/cm2
|
Arc Flash Boundary: 58inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: 277
|
Emergency Number to Call: 6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 275
|
Fire Extinguisher Location: 275
|
Contact release method available and tested: Upstream breaker or switch, Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location, Fall hazard |
Error Precursors
Task Demands: Time pressure (in a hurry), High workload (memory requirements), Critical steps or irreversible acts
|
Work Environment: Distractions/interruptions, Unexpected equipment conditions
|
Individual Capabilities: Unfamiliar with, or first time performing task, Lack of proficiency or experience
|
Human Nature: Stress (limits attention), Assumptions, Mental shortcuts (biases)
|
Error Precursor Mitigations:
Going up and down stairs, pitched rooftop, walk with caution. |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |