Time / Date: 7/9/2025 12:01:33
|
JSP ID: 3911
|
|
Scope of Work: Turn off CIrcuit breakers and verify conductors in Wireway are not energized
|
|
|
Work Order: 446701
|
Building: B6
|
|
Person in Charge: Robert Ralph
|
Lead / Supervisor: Combs, Everett
|
|
Logged Email: RobertRalph@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
|
Second Person Requirement: Standby Person
|
|
|
Second Person Identified: Shane MILLER
|
|
|
List Other Participants:
|
|
|
Affected Persons Notified: Yes
|
|
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 318A
|
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
|
Control of Hazardous Energy: Complex LOTO w/ RI
|
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
1.) Turn off 4 circuit breakers 2.) Establish LOTO 3. Verify conductors in Wireway are deenergized 4.) reenergize after work is complete |
Control of Work Area
|
Minimum Approach Boundary: 94”
|
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
|
System Voltage: 120/208 V ac
|
|
Limited Approach Boundary: 42 inches
|
|
Restricted Approach Boundary: 12 inches
|
|
Will the hands enter the RAB: Yes
|
|
Voltage Glove Class: 0
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 16.9 cal/cm2
|
|
Arc Flash Boundary: 94”
|
|
Working Distance: 18 inches
|
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
|
Capacitor Bus Voltage:
|
|
Capacitor total stored energy (joules):
|
|
Discharge wait time (minutes):
|
Emergency Response Plan
|
Nearest Landline Location: Here by door to sector 6
|
|
Emergency Number to Call: 911
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: Lobby B6
|
|
Fire Extinguisher Location: By labyrinth door sector 6
|
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
|
Task Demands:
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature:
|
|
Error Precursor Mitigations:
Everything is good |
PPE Inspections
|
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |