Time / Date: 7/17/2025 8:10:55
|
JSP ID: 3931
|
Scope of Work: Switch and ZVV for work in ba panel S021314
|
|
Work Order: 445934
|
Building: 6 pit sector 2
|
Person in Charge: Christopher Nelson
|
Lead / Supervisor: Combs, Everett
|
Logged Email: cnelson@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Beau Irwin
|
|
List Other Participants: EM’s ALS
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 314A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
JSP get EM for Admon lock PPE inspection switch LOTO ZVV when established begin work switching rack to pdu |
Control of Work Area
Minimum Approach Boundary: 94
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 16.8 cal/cm2
|
Arc Flash Boundary: 94
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: Within 15 ft on storage ring entrance wall
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 50’ away next to booster ring linac entrance
|
Fire Extinguisher Location: Next to land line
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Noisy environment |
Error Precursors
Task Demands: Time pressure (in a hurry)
|
Work Environment: Obscure electrical supplies or configurations
|
Individual Capabilities:
|
Human Nature: Stress (limits attention)
|
Error Precursor Mitigations:
Be aware of the equipment warnings and be safe at all times keep on task and leave everything else at home that could distract your attention from the task |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
Switch only ZVV separate
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: