QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 7/26/2025 13:33:05
JSP ID: 3969
Scope of Work: Swap out FSD for new FSD

General Information

Work Order
435434
Building
B70
Person in Charge
Noel Cuffee
Lead / Supervisor
Baird, Shawn
Logged Email
edbekheet@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 0 - Electrically Safe Work Condition
☑ Mode 1 - LOTO & Zero Voltage Verification
QEW Level
QEW 1
Second Person Requirement
Not Required
Second Person Identified
Pete Combs
Other Participants
Ed Bekheet
Affected Persons Notified
Yes

System / Equipment

Switching
Non-Hazardous Switching
Panel / Equipment ID
N/A used and LOTO switch by damper
System Information Review
Control of Hazardous Energy
Simple LOTO
Equipment Condition
☑ Properly installed
☑ Properly maintained
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
1. Switch power off and LOTO switch, or breaker 2. Perform ZVV 3. Swap out FSDs 4. Reenergize and test FSD

Control of Work Area

Minimum Approach Boundary
42
Barricade Tape / Attendant
Attendant

Shock Risk Assessment

System Voltage
120 Vac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
3 inches
Will the hands enter the RAB
No
Voltage Glove Class
0
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
cal/cm2
Arc Flash Boundary
N/A
Working Distance
No Arc Flash Hazard Present
Arc Flash PPE Level
Minimum PPE for Electrical Work
Incident Energy Reduction Measures
0

Capacitor Hazards

Capacitor Bus Voltage
Capacitor Total Stored Energy (Joules)
Discharge Wait Time (Minutes)

Emergency Response Plan

Nearest Landline Location
In corridor by Rm 279
Emergency Number to Call
911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
1st floor lobby of B70by entrance
Fire Extinguisher Location
By Rm 275
Contact Release Method Available and Tested
Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?
We had to use the switch next to the damper. No breaker identification was written

Error Precursors

Task Demands
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
Went over error precursors

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Removal of conductive articles
☑ Insulated tools
☑ Multimeter and other electrical test instruments

Notes / Other

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan