Time / Date: 1/4/2023 9:46:58
JSP ID: 399
Scope of Work: LOTO, ZVV, Remove power supply for testing
Work Order: None
Building:
Person in Charge: S. Small
Lead / Supervisor: Other
Logged Email: smsmall@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: T. Hassan
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: Valley Coil 1A Power Supply
System Information Review: Single Line Drawing, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Perform simple LOTO, ZVV on 240VAC input to power supply, disconnect power supply.

Control of Work Area

Minimum Approach Boundary: 42
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120/240 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: Avoid contact
Will the hands enter the RAB: No
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 4.16 cal/cm2
Arc Flash Boundary: 39 inches
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: 324
Capacitor total stored energy (joules): 247
Discharge wait time (minutes): 4

Emergency Response Plan

Nearest Landline Location: Switchgear room work desk
Emergency Number to Call: 7911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: 88 Lobby
Fire Extinguisher Location: Switchgear room
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov