Time / Date: 8/7/2025 6:28:08
|
JSP ID: 4014
|
|
Scope of Work: Power down fire alarm control panel and sub panels
|
|
|
Work Order: W0450812
|
Building: 23
|
|
Person in Charge: Peter combs
|
Lead / Supervisor: Baird, Shawn
|
|
Logged Email: pacombs@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 1
|
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
|
Second Person Requirement: Not Required
|
|
|
Second Person Identified:
|
|
|
List Other Participants:
|
|
|
Affected Persons Notified: Yes
|
|
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: Panel B by rm 110
|
|
System Information Review: Panel Schedules
|
|
|
Control of Hazardous Energy: Simple LOTO
|
|
|
Equipment Condition:
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
Our system on test Disconnect battery’s. Switch breaker #23 and #32 on panel B in hallway by 110 Apply locks |
Control of Work Area
|
Minimum Approach Boundary:
|
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
|
System Voltage: No Shock Hazard Present
|
|
Limited Approach Boundary: None
|
|
Restricted Approach Boundary: None
|
|
Will the hands enter the RAB: No
|
|
Voltage Glove Class: Not Required
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 16 cal cal/cm2
|
|
Arc Flash Boundary: No
|
|
Working Distance: No Arc Flash Hazard Present
|
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
|
Capacitor Bus Voltage:
|
|
Capacitor total stored energy (joules):
|
|
Discharge wait time (minutes):
|
Emergency Response Plan
|
Nearest Landline Location: Lobby
|
|
Emergency Number to Call: 911
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: Lobby
|
|
Fire Extinguisher Location: By107
|
|
Contact release method available and tested:
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
|
Task Demands:
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature:
|
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Safety glasses (ANSI Z87),
Removal of conductive articles, Insulated tools, Leather gloves |
Notes / Other
|
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |