|
Time / Date: 9/9/2025 9:52:30
|
JSP ID: 4103
|
|
Scope of Work: Release LOTO
|
|
|
Work Order: 415062
|
Building: 6 ALS S-Pit
|
|
Person in Charge: Christopher Nelson
|
Lead / Supervisor: Keusch, Justen
|
|
Logged Email: cnelson@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
|
Second Person Requirement: Standby Person
|
|
|
Second Person Identified: David Davis
|
|
|
List Other Participants:
|
|
|
Affected Persons Notified: Yes
|
|
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 302A4A
|
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
|
Control of Hazardous Energy: Simple LOTO
|
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
Briefing with lead, JSP inspect PPE that is selected with JSP don selected ppe notify affected persons second person is present switch breaker |
Control of Work Area
|
Minimum Approach Boundary: 66 in
|
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
|
System Voltage: No Shock Hazard Present
|
|
Limited Approach Boundary: 42 inches
|
|
Restricted Approach Boundary: 3 feet, 6 inches
|
|
Will the hands enter the RAB: No
|
|
Voltage Glove Class: 0
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 12.5 cal/cm2
|
|
Arc Flash Boundary: 66 in
|
|
Working Distance: 18 inches
|
|
Arc Flash PPE Level: 2
|
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
|
Capacitor Bus Voltage: Na
|
|
Capacitor total stored energy (joules): Na
|
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
|
Nearest Landline Location: On rack s 0825
|
|
Emergency Number to Call: 911
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: Lobby of six
|
|
Fire Extinguisher Location: Sector 10
|
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
Insufficient lighting |
Error Precursors
|
Task Demands:
|
|
Work Environment: Distractions/interruptions
|
|
Individual Capabilities:
|
|
Human Nature: Stress (limits attention)
|
|
Error Precursor Mitigations:
Keep stress to a minimum don’t get distracted use a task light |
PPE Inspections
|
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles |
Notes / Other
|
Just switching on released LOTO
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |
