Logo

QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 9/26/2025 7:52:45
JSP ID: 4143
Scope of Work: Perform annual test of the emergency fixtures

General Information

Work Order
Turn off breakers then reenergize
Building
90
Person in Charge
Egon Hampton
Lead / Supervisor
Keusch, Justen
Logged Email
efhampton@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 0 - Electrically Safe Work Condition
QEW Level
QEW 2
Second Person Requirement
Not Required
Second Person Identified
Na
Other Participants
Na
Affected Persons Notified
Yes

System / Equipment

Switching
Non-Hazardous Switching
Panel / Equipment ID
E90A4A9A3A
System Information Review
☑ Panel Schedules
Control of Hazardous Energy
Cord & Plug LOTO
Equipment Condition
☑ Properly installed
☑ Properly maintained
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
Turn off breakers for the units

Control of Work Area

Minimum Approach Boundary
Signs designating outage time contacts
Barricade Tape / Attendant
Attendant

Shock Risk Assessment

System Voltage
No Shock Hazard Present
Limited Approach Boundary
None
Restricted Approach Boundary
None
Will the hands enter the RAB
No
Voltage Glove Class
0
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
4.7 cal/cm2
Arc Flash Boundary
42”
Working Distance
No Arc Flash Hazard Present
Arc Flash PPE Level
2
Incident Energy Reduction Measures
0

Capacitor Hazards

Capacitor Bus Voltage
Na
Capacitor Total Stored Energy (Joules)
Na
Discharge Wait Time (Minutes)
Na

Emergency Response Plan

Nearest Landline Location
Lobby
Emergency Number to Call
699
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
Lobby
Fire Extinguisher Location
Lobby
Contact Release Method Available and Tested
Non electrical work

Environmental Conditions

Does the environment present additional hazards that should be addressed?
Na

Error Precursors

Task Demands
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
Na

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Na

Notes / Other

Test of emergency fixtures

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan