Logo

QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 9/26/2025 9:07:21
JSP ID: 4144
Scope of Work: Install new 208V 20A receptacle in room 110

General Information

Work Order
445308
Building
62
Person in Charge
Greg Neidiger
Lead / Supervisor
Ramer, Robert
Logged Email
gcn@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 1 - LOTO & Zero Voltage Verification
QEW Level
QEW 2
Second Person Requirement
Standby Person
Second Person Identified
Beau Erwin
Other Participants
Affected Persons Notified
Yes

System / Equipment

Switching
Hazardous Switching
Panel / Equipment ID
67A18A
System Information Review
☑ Panel Schedules
☑ Arc Flash Labels
Control of Hazardous Energy
Simple LOTO
Equipment Condition
☑ Properly installed
☑ Properly maintained
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
1) Switch and LOTO at panel 67A-18 2) ZVV at 67A18A 3) perform work 4) inspection 5) release LOTO

Control of Work Area

Minimum Approach Boundary
76”
Barricade Tape / Attendant

Shock Risk Assessment

System Voltage
120/208 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
12 inches
Will the hands enter the RAB
Yes
Voltage Glove Class
0
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
Switching - 24.4 ZVV - 16.1 cal/cm2
Arc Flash Boundary
76 inches
Working Distance
18 inches
Arc Flash PPE Level
4
Incident Energy Reduction Measures
0

Capacitor Hazards

Capacitor Bus Voltage
Capacitor Total Stored Energy (Joules)
Discharge Wait Time (Minutes)

Emergency Response Plan

Nearest Landline Location
Rm111
Emergency Number to Call
911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
Elevator lobby
Fire Extinguisher Location
Corridor near rm 115
Contact Release Method Available and Tested
Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?
None

Error Precursors

Task Demands
Work Environment
Individual Capabilities
Human Nature
Assumptions
Error Precursor Mitigations
We are assuming labeling is correct. In the case that labeling is not correct, standby is prepared to take the entire bank in the case of emergency. Care will be taken presume breaker could be mislabeled and the panel will still be energized after switching.

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Removal of conductive articles
☑ Insulated tools
☑ Multimeter and other electrical test instruments

Notes / Other

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan