Time / Date: 9/30/2025 7:07:57
|
JSP ID: 4151
|
Scope of Work: Terminate and install a low voltage cable in a terminal block box.
|
|
Work Order:
|
Building: 88
|
Person in Charge: Brendan Ford
|
Lead / Supervisor: Other
|
Logged Email: bpford@lbl.gov
|
Division: Other
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified:
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: EJ0
|
System Information Review: Single Line Drawing
|
|
Control of Hazardous Energy: Complex LOTO w/ RI
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Open box, cover exposed terminal blocks that are 120VAC with rubber sheeting, terminate low voltage cable on terminals, remove sheeting and close box up. |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant: Notice - Blue, Attendant
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: Yes
|
Arc Flash Risk Assessment
Incident Energy: none cal/cm2
|
Arc Flash Boundary: none
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: 0 volts
|
Capacitor total stored energy (joules): none
|
Discharge wait time (minutes): 0
|
Emergency Response Plan
Nearest Landline Location: North side of room.
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: In Control Room.
|
Fire Extinguisher Location: North side of Room by door.
|
Contact release method available and tested: Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Noisy environment |
Error Precursors
Task Demands: Critical steps or irreversible acts
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Have attendant verbally verify installation steps. |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |