Time / Date: 1/9/2023 11:09:02
JSP ID: 420
Scope of Work: Remove Data Loggers 33PNL042
Work Order: W0303742
Building:
Person in Charge: Pica, Joseph D.
Lead / Supervisor: Cameron, Benjamin
Logged Email: josephpica@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Safety Watch
Second Person Identified: Ben Cameron
List Other Participants: None
Affected Persons Notified: Yes
Switching: No Switching Required
Panel / Equipment ID: E642A Bkr 10 &15
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Start DataSplice Work Order Walk /Brief Task PPE Cat3 Access Panel (Hinged) Remove Data Logger Close Up Return Data Logger to Retrieve Monitored Period

Control of Work Area

Minimum Approach Boundary: 104”
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 104”
Restricted Approach Boundary: 3 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 21cal cal/cm2
Arc Flash Boundary: 104”
Working Distance: 18 inches
Arc Flash PPE Level: 3
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: N/A
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: At Rear Entrance
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Crew Carry
Fire Extinguisher Location: At entrance
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Constant Communication Verbatim Repeat Backs Second Checks

PPE Inspections

Notes / Other

None

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov